3-42.
Which of the following situations
may require a CASREP?
1.
Outside assistance is required
to correct a casualty
2.
A casualty results from
inadequate GPETE or PMS
3.
Both 1 and 2 above
4.
Spare parts are desired for an
equipment
QUESTIONS 3-43 THROUGH 364 PERTAIN TO
CHAPTER 7.
343.
Which of the following calibration
echelons maintains the highest
standards within the Navy
calibration program and maintains
and disseminates measurements of
the highest accuracy within the
program?
1.
Metrology Engineering Center
(MEC)
2.
Navy Standards Laboratory, Type
I
3.
Navy Standards Laboratory, Type
II
4.
Navy Calibration Laboratory
(NCL)
344.
What calibration echelon has
custody of the nations basic
physical standards, provides the
common reference for all measure-
ments made within the scope of the
Navy calibration program, and
certifies the Navy standards?
1.
National Bureau of Standards
(NBS)
2.
Metrology Engineering Center
(MEC)
3.
Navy Standards Laboratory, Type
I
4.
Navy Standards Laboratory, Type
II
345.
What calibration echelon is
established aboard tenders and
repair ships and at selected shore
activities, and provides
calibration for fleetheld and
selected shorebased activities
test equipment?
1.
Navy Standards Laboratory, Type
I
2.
Navy Standards Laboratory, Type
II
3.
Fleet Calibration Laboratory
(FCL)
4.
Field Calibration Activity
(FCA)
3-46.
Which of the following statements
best describes what the MEASURE
program is designed to provide for
the Navy?
1.
MERSURE establishes a set of
standards for all equipment
that requires a high standard
of accuracy
2.
MEASURE provides calibrated
test equipment and devices to
the fleet and shore activities
where deficiencies exist
3.
MEASURE provides an automated,
standardized system for the
recall and scheduling of test
equipment into calibration
facilities
347.
Which of the following actions
begins the initial cycle of MEASURE
for an activity?
1.
2.
3.
The activity initiates a formal
request to the Navy Metrology
and Calibration (METCAL)
Program office electing to have
their activitys test equipment
placed in the MEASURE program
The activity completes MEASURE
TMDE inventory report forms for
its test equipment and forwards
them to the appropriate MEASURE
data processing facility (DPF)
to establish a database
Items of test equipment are
automatically placed into the
program upon receipt of the
data from the 1348 supply
requisition
23