36.
Which of the following names is/are
given to the main control point, of
electronics casualty control?
1.
Electronics Control Center
2.
Electronics Casualty Control
Center
3.
Repair 8
4.
Both 2 and 3 above
37.
What are the four main areas of the
ECC organization?
1.
ECC, casualty investigator
teams, electronic equipment
spaces, and the pilot house
assignments
2.
ECC, secondary ECC, casualty
investigator teams, and
electronic equipment space
assignments
3.
ECC, CIC, pilot house, and
engineering repair party
assignments
4.
FCC, secondary ECC, pilot
house, and electronic equipment
space assignments
3-8.
Which of the following is the
complement of personnel assigned to
an ideal primary ECC (or Repair 8)?
1.
The EMO, a senior
CPO/PO,
status board plotter/phone
talker, and at least one
investigator team
2.
The assistant EMO, status board
plotter/phone talker, and at
least one investigator team
3.
The senior CPO/PO, and at least,
one investigator team
4.
The EMO and at least one
investigator team
39.
For each deployment, when do
electronics casualty control
responsibilities begin?
3-10.
When the electronics organization
is prepared for battle readiness,
there are several readiness steps
that must be taken.
Which of the
following readiness steps is NOT
correct?
1.
Personnel are properly assigned
to battle stations and properly
trained
2.
ECC and secondary ECC have the
only ECC manuals for continuity
of casualty control
3.
All casualty control kits are
complete and have been stored
correctly
4.
All spaces have been cleaned of
missile and fire hazards
311.
After general quarters has been
sounded,
the ECC organization must
ensure direct and positive control.
Which of the following actions is
normally part of the ECC centers
responsibility?
1.
Establishing immediate
communications with all
assigned stations
2.
Ensuring that all personnel are
accuunted for and ready for
battle
3.
Maintaining positive
communication with applicable
electronics spaces
4.
Each of the above
3-12.
Which of the following routes, if
any, should investigative teams or
personnel providing technical or
parts assistance use?
1.
The shortest route
2.
Preestablished routes as
applicable
3.
Any route that does not require
the opening of Y fittings
4.
None of the above
1.
At the beginning of general
quarters
2.
At the beginning of sea detail
3.
Prior to the ship going to sea
4.
When there is an electronics
casualty
18