Figure 14-8.--Navy standard damage control symbology--Continued.
Some of the specific functions for which Repair 5 is
formats, such as those shown in figure 14-10. In
reading this message, you should have come up with the
responsible in its own assigned area include the
following information: An 8-inch hole, 4 feet up from
following:
the deck at frame 38, starboard side of compartment
1. Maintenance of stability and buoyancy.
2-35-0-L.
Members of the repair party must meet the
While techniques of damage control are identical
following criteria:
among the repair parties, each repair locker is
a. Be stationed so that they can reach all parts
responsible for an area of the ship. One of the
of their assigned area with a minimum
more demanding areas of responsibility is Repair 5,
opening of watertight closures.
which is responsible for the main engineering spaces.
14-14