Figure 14-6.-Sample component/system alignment diagram.
The CO has the responsibility of deciding whether
thoroughly investigated and reported to the engineer
to continue operation of equipment under casualty
officer. To maintain maximum available speed and
conditions. Such a decision carries the possible risk of
services, the engineer officer must be informed at all
permanent damage and can be justified only when the
times of the condition of the plant.
14-10