• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13-16.--Supplemental Form, OPNAV 4790/2L.
ESTIMATING WORK

Electricians Mate
Page Navigation
  466    467    468    469    470  471  472    473    474    475    476  
img
is in your CSMP suspense file. For more detailed
may also be used to list multiple-item serial numbers
and locations for which identical maintenance
information about these forms and schedules and how
requirements exist from an outside activity. It may also
to fill them out, review OPNAVINST 4790.4 (fig.
be used to list drawings and sketches.
13-17).
Automated Ship's Maintenance Action
Methods for Scheduling Work
Form, OPNAV 4790/2Q
Some of the proven methods you should follow
OPNAV Form 4790/2Q is an automated work
when scheduling maintenance and repair work are listed
request produced by an IMA with computer capabilities.
below.
The 2Q is produced from the original 4790/2k, which
Figure 13-17.--Automated Ship's Maintenance Action Form, OPNAV 4790/20.
13-21


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.