• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure 13-12.--Weekly PMS Schedule.
Figure 13-15.--Ship's Maintenance Action Form, OPNAV 4790/2K.

Electricians Mate
Page Navigation
  463    464    465    466    467  468  469    470    471    472    473  
img
Figure 13-13.--Current Ship's Maintenance Project (CSMP).
The Maintenance Data Collection Subsystem
entered into the Maintenance Data System (MDS) for a
particular unit. The CSMP can be divided by unit,
(MDCS) Forms, such as OPNAV 4790/2K,
department, division, and workcenter. It is a valuable
OPNAV 4790/2L, and OPNAV 4790/2Q.
tool for the workcenter supervisor when scheduling
Current Ship's Maintenance Project (CSMP)
work to conform to the ship's schedule.
The CSMP (fig. 13-13) is a computer generated
document listing the maintenance actions that have been
Figure 13-14.--Recommended format for the job control number log.
13-18


Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved.