This report indicates the amount of fuel oil and water on
report of engineering data. From this report the
hand as of midnight, the previous day. The Fuel and
operating efficiency and general performance of the
Water Report also includes the previous day's feed and
ship's engineering plant can be calculated (see fig.
13-6). Requirements for this report are contained in
potable water performance and results of water tests.
Fleet Commander Instructions. This report is prepared
The original and one copy are submitted to the OOD in
by the engineer officer and verified, as to fuel receipts,
sufficient time for submission to the commanding
by the supply officer. It is then approved and fowarded
officer or command duty officer with the 1200 reports.
by the CO directly to the fleet commander. A copy is
Monthly Summary, CINCLANTFLT 3100-4
retained on board in the files of the engineering
The Monthly Summary of Fuel Inventory and
department. An additional copy of the report may be
provided to the type commander.
Steaming Hours Report is a comprehensive monthly
Figure 13-6.--Monthly Summary of Fuel and Steaming Hours Report, CINCLANTFLT Report 3100-4.
13-8