427.
To what kind of work do QA
requirements apply?
1.
Work done by IMAs only
2.
Work done by ships force only
3.
Work done by IMAs as well as
work done by ships force
4.
Work done by an overhaul
facility
4-28.
There are five levels of
responsibility for the QA program
for the Atlantic fleet surface
force: (1) force commander, (2)
audits, (3) squadron commanders,
(4) IMAs, and (5) what other level?
1.
Force ships
2.
TYCOM
3.
Departments
4.
Officers in charge
429.
Which of the following terms is
defined as the degrees of control
measures required to assure
reliability of repairs made to a
system, subsystem, or component?
1.
Inprocess inspection
2.
Levels of control
3.
Levels of assurance
4.
Levels of essentiality
430.
Which of the following terms
applies to an item that has had its
material composition tested and
verified?
1.
Level I
2.
SUBSAFE
3.
Controlled material
4.
Specification
431.
What procedure(s) should you follow
if, during a repair process
involving simultaneous performance
of procedure steps, the steps are
in different locations?
432.
CMPOS are trained and qualified by
the QA supervisor and should be
what paygrade(s)?
1.
E3/E4
2.
E4 only
3.
E5 only
4.
E4/E5
433.
Which of the following terms is
associated with the range of
controls representing a high degree
of confidence that procurement
specifications have been met?
1.
Inprocess inspection
2.
Levels of control
3.
Levels of assurance
4.
Levels of essentiality
434.
A departure from specifications is
a lack of compliance with a
procedure, an instruction, or which
of the following directives?
1.
An IG
2.
An NSTM
3.
An order
4.
A plan
435.
What QA term is defined as any
technical or administrative
directive that defines repair
criteria?
1.
Procedure
2.
Reliability
3.
Specification
4.
Technical repair standard
4-36.
Which of the following is NOT a
description of controlled material?
1.
Has special markings
2.
Has accountability throughout
the repair or manufacturing
process
3.
Is stowed separately
4.
Must be open purchased
1.
Reject the job and send the CWP
back to planning
2.
Make a copy of the CWP with its
documentation for each job site
3.
Use locally developed practices
4.
Have the CWP at one job site
25