418.
Which of the following problems may
cause a worker to fail to report a
departure from specifications?
1.
Lack of training
2.
Lack of adequate planning
3.
Lack of adequate inspection
4.
Each of the above
419.
Which of the following is a system
that ensures materials, data,
supplies,
and services conform to
technical requirements and repaired
equipment performs satisfactorily?
1.
Levels of assurance
2.
Quality control
3.
Quality assurance
4.
Levels of control
420.
If you wish to have a greater
understanding of the terms used
throughout the QA program, you may
review either the appropriate TYCOM
manual or what other publication?
1.
OPNAVINST 4790.4B
2.
MILSTD109
3.
NAVSEA OD 45845
4.
OP 43P6A
421.
Who is responsible for recertifying
all SQCIs and CMPOs upon expiration
of their respective qualifications?
1. TYCOM
2. CO
3. QAO
4. QAS
422.
The person with the most direct
concern for quality workmanship
within a work center is which of
the following personnel?
1.
The production supervisor
2.
The shop craftsman
3.
The division officer
4.
The department head
4-23.
4-24.
4-25.
426.
Which of the following is an
example of a QA action performed
following the completion of a
series of tasks?
1.
Final inspection
2.
Inprocess inspection
3.
Receiving inspection
4.
Screening inspection
When asisigned as an SQCI, how
familiar should you be with aspects
of the QA program and the quality
control procedures and requirements
of your specialty?
1.
Partially familiar, as a
minimum
2.
Partially familiar with aspects
of the QA program and
thoroughly familiar with QC
procedures and requirements
3.
Thoroughly familiar with all
aspects of the QA program and
partially familiar with QC
4.
Thoroughly familiar with all
aspects of the QA program and
QC procedures and requirements
Because the instructions set forth
within the QA manual are general in
nature, each activity must
implement a QA program to meet the
intent of the QA manual.
1.
True
2.
False
Failure to complete a required
retest of a component or subsystem
that, if defective, could cause
flooding would require submission
of what type of departure from
specifications?
1.
Critical departure from
specifications
2.
Minor departure from
specifications
3.
Major departure from
specifications
4.
Semiminor departure from
specifications