228.
Which of the following statements
correctly describe(s) voyage
repairs?
1.
Repairs of an emergency nature
that must be made to enable a
ship to continue on its mission
2.
Repairs of an emergency nature
that can be made without
requiring a change in the
ships operating schedule
3.
Repairs that normally cannot be
made by ships force
4.
All the above
2-29.
Which of the following are the main
sources for the definition of work
required for shipyard overhaul?
1.
Ships knowledge and the CSMP
2.
Ships knowledge and the POT&I
3.
The CSMP and the POT&I
4.
Ships knowledge, the CSMP, and
the POT&I
A. Preoverhaul Test and Inspection
(POT&I)
B. Conduct of other POT&Is desig
nated by the type commnder and
concurrent development by the
naval shipyard or SUPSHIPS
C. Maintenance work definition
review scheduled by the type
commander
D. Type commander screening of CSMP
and work identified by POT&I
E. CSMP validation
Figure 2A .--Work requirements.
IN ANSWERING QUESTIONS 2-30 AND 231,
SELECT THE CORRECT RESPONSE FROM FIGURE
2A.
2-30.
Which of the following is the
correct sequence for the
231.
In what step of the SARP
development must the ship place in
priority order all work require
ments that have been screened, but
not yet authorized for industrial
accomplishment?
1. B
2. C
3. D
4. E
232.
When the electronics work list is
prepared before overhaul, where
does most of the information come
from?
1.
PMS requirements
2.
Division planning list
3.
CSMP
4.
Individual work lists
2-33.
Which of the following statements
is NOT correct concerning the
responsibilities of the electronics
division during overhaul?
1.
2.
3.
4.
Once the overhaul personnel
assume the equipment and
systems,
the electronics
division no longer has any
responsibility for the
applicable equipment and
systems
The electronics division
maintains responsibility for
applicable equipment and
systems being repaired
continues throughout the
overhaul
The electronics division must
inspect the work during repairs
and upon completion
The electronics division must
sign off jobs that are
completed, using the QA Manual
as a reference
development of the Ship Alteration
and Repair Package (SARP)?
1.
A, B, C, D, E
2.
A, D, E, C, B
3.
D, A, E, B, C
4.
E, A, D, B, C