APPENDIX II
REFERENCES USED TO
DEVELOP THIS NRTC
NOTE: Although the following references were current when
this NRTC was published, their continued currency cannot be
assured. When consulting these references, keep in mind that
they may have been revised to reflect new technology, revised
methods, practices, or procedures. Therefore, you need to ensure
that you are studying the latest references.
Air Conditioning Plant, 80-Ton Capacity, NAVSEA 0959-LP-049-8010, Naval
Sea Systems Command, Washington, DC, Oct 1985. (Chapter 5)
Bibliography for Advancement Study, NAVEDTRA 12052, Naval Education
and Training Program Management Support Activity, Pensacola, FL,
1995. (Chapter 1)
Blueprint Reading and Sketching, NAVEDTRA 14040, Naval Education and
Training Professional Development and Technology Center, Pensacola,
FL, May 1994. (Chapter 2)
Cable Comparison Guide, NAVSEA 0981-LP-052-8090, Naval Sea Systems
Command, Washington, DC, Feb 1975. (Chapter 3)
Cable Comparison Handbook, MIL-HDBK-299(SH), Naval Sea Systems
Command, Washington, DC, Apr 1989. (Chapter 3)
Commutator/Slip Ring Maintenance Handbook, NAVSEA S9310-AC-HBK-
010, Naval Sea Systems Command, Washington, DC, May 1988, Ch. A.
(Chapter 7)
Deep Fat Fyer, NAVSEA 0943-LP-115-8010, Naval Sea Systems Command,
Washington, DC, May 1977. (Chapter 5)
Electrical Machinery Repair, NAVSEA 0900-LP-060-2010, Naval Sea Systems
Command, Washington, DC, Sep 1985, Ch. A. (Chapter 7)
Electric Plant Installation Standard Methods for Surface Ships and Submarines,
DOD-STD-2003-1(NAVY), Naval Sea Systems Command, Washington,
DC, Jun 1987. (Chapter 3,)
Electronic Installation and Maintenance Handbook (EIMB), NAVSEA SE000-
00-EIM-100, Naval Sea Systems Command, Washington, DC, Apr 1983.
(Chapters 2 and 3)
Electrostatic Precipitator Model 430350, Naval Sea Systems Command
Washington, DC, Oct 1981. (Chapter 5)
Fathom, Fall 1984, Safety Poster. (Chapter 1)
AII-1