• Home
  • Download PDF
  • Order CD-ROM
  • Order in Print
Figure  5-2.Casualty  category  decision  tree.
CANCEL  CASREP

Electronics Technician Supervisor (ET1)
Page Navigation
  80    81    82    83    84  85  86    87    88    89    90  
UPDATE CASREP With   the   exception   of   the   CASUALTY   and ESTIMATE sets, you need to report in the UPDATE CASREP   only   previously   unreported   casualty information or information that has changed (or was reported  in  error).  In  most  cases,  you  may  change information in a previously reported data set by merely submitting the same data set again with the corrected information.  You  must  submit  an  UPDATE  CASREP  for a casualty when any of the following criteria apply: 1.  There  is  a  need  to  complete  information reporting requirements or to revise previously submitted information. 2. The casualty situation changes; for example, the estimated repair date has changed, parts status has changed  significantly,  additional  assistance  is  needed, and so on. 3. Additional malfunctions are discovered in the same item of equipment. 4. All parts ordered to repair the equipment are received. 5.   Upon   receipt   of   any   significant   part   or There can only be one outstanding CASREP for each   item   of   equipment.   Additional   problems   or malfunctions on the same item must be reported using an   UPDATE   CASREP   and   do   not   require   the submission  of  a  new  INITIAL  CASREP. Each  casualty  being  updated  in  an  UPDATE CASREP must begin with a CASUALTY set followed by one or more sets that provide information concerning that casualty. An AMPN set must be used (immediately following the  ESTIMATE  set)  to  report  the  receipt  of  parts previously  reported  as  being  required  to  repair  a casualty. CORRECT CASREP You  must  submit  a  CORRECT  CASREP  when equipment that has been the subject of a casualty report is repaired and back in operational condition. When you use a CASREP to report the correction of a casualty situation,  include  the  following  information  in  an AMPN  set: 1. The delay, expressed in hours, in correcting the casualty because of pacts unavailability, caused by the equipment, inclusion of the date of receipt is required. supply  system. Figure  5-3.–Casualty  categories  and  criteria. 5-9






Western Governors University

Privacy Statement
Press Release
Contact

© Copyright Integrated Publishing, Inc.. All Rights Reserved. Design by Strategico.